船体定位在工作途中很重要,那么您是否知道其该具体如何定位呢?别急,小编告诉你:
1、定位桩:为一根卷板构成筒状的构件,下端呈锥形,外形相似于一支铅笔,故又称铅笔桩。底部一般灌注石块或铁块,以降低重心。
2.钻探抽沙船均配有两根固定桩。施工时,主桩位于开挖中心线上并保持插入状态,副桩保持悬空状态。当需要挖泥船前移、改变绞刀的纵向切土时,主副桩交替下落。严禁两根固定桩同时下落进行施工生产及抗风。
3.钻探抽沙船一般装配定位桩台车装置,其主桩安装在一个由液压油缸推动可相对于船体作短距离前后移动的台车上。其作用是大大减少了换桩的时间,提高了生产效率。
我们会与广大客户一起实现社会、环境及利益相关的和谐共生!
It is important to have a ship's position on the job, so if you know how to locate it? Don't worry, small make up to tell you:
1、定位桩:为一根卷板构成筒状的构件,下端呈锥形,外形相似于一支铅笔,故又称铅笔桩。底部一般灌注石块或铁块,以降低重心。
1, a positioning pile: a root bending a cylindrical component and the bottom is tapered, similar in appearance to a pencil, so it is also called pencil pile. At the bottom of the general perfusion of stone or iron, to lower the center of gravity.
2.钻探抽沙船均配有两根固定桩。施工时,主桩位于开挖中心线上并保持插入状态,副桩保持悬空状态。当需要挖泥船前移、改变绞刀的纵向切土时,主副桩交替下落。严禁两根固定桩同时下落进行施工生产及抗风。
2 drilling pumping sand are equipped with two fixed pile. During construction, the main pile is located on the excavation center line and keeps the insert state. When the longitudinal cutting soil need to dredge forward and change reamer, main and auxiliary pile falling alternately. Construction production and wind resistance of two fixed piles are strictly prohibited at the same time.
3.钻探抽沙船一般装配定位桩台车装置,其主桩安装在一个由液压油缸推动可相对于船体作短距离前后移动的台车上。其作用是大大减少了换桩的时间,提高了生产效率。
3. Drilling pumping sand General Assembly of spud carrier device, the main pile installation in a hydraulic cylinder can be pushed relative to the hull for a short distance before and after the mobile trolley. The effect is greatly reduced the time for changing the pile, and the production efficiency is improved.
我们会与广大客户一起实现社会、环境及利益相关的和谐共生!
We will work together with our customers to achieve social, environmental and benefits related to the harmonious symbiotic! |